Projects

Dunbrody Visitor Centre

Location: New Ross, Wexford
Main Contractor: Clancy Construction, Co. Tipperary
Engineer: Malone O’Regan, Waterford

F&M were responsible for the removal of existing steel work on this building, and supplied & manufactured replacement intumescent painted structural steel work, purlins and metal decking. We also supplied and fitted light steel works including gangway steel, open grid flooring, gates, frames and handrails.

  • SHARE THIS »